Data rooms are opened in a rush and closed in a hurry. Once the deal signs or the round closes, attention moves on, the subscription lapses and the room is forgotten. Months later, someone asks for the Q&A log to resolve a warranty question, or a privacy request arrives asking where an employee’s data went. Both questions are easier if retention and deletion were handled deliberately.
This guide covers the two halves of the job: keeping the record you need, and making sure the vendor deletes everything else.
What should be kept after a deal?
The archive is the record of what was disclosed, to whom and when. It is useful in warranty and indemnity claims, in disputes about what a buyer knew, in regulatory inquiries and in the next transaction involving the same company.
| Item | Why it matters | Format to ask for |
|---|---|---|
| Documents as disclosed | Shows exactly what was in the room, including versions | Folder structure with index numbers, original files |
| Index | Ties documents to the numbers used in the disclosure letter and reports | Spreadsheet or PDF with dates |
| Q&A log | Records every question, answer, release date and recipient | Spreadsheet or PDF with attachments |
| Activity log | Shows who viewed, downloaded or printed which document and when | Spreadsheet export, filterable |
| User and group list | Shows who had access to which folders | Export with dates added and removed |
| Permission history | Shows when folders were opened to each group | Export or report where available |
Many sell-side lawyers also ask for the archive on an encrypted USB drive or a closing set agreed with the buyer, sometimes signed off by both sides. Decide the format at the start of the process, because some platforms charge for archive production and some exports are only available while the room is active.
How do retention and deletion actually work?
Retention settings inside the software control what stays visible in the room. Deletion is what happens on the vendor’s systems when content is removed or the contract ends. They are different things.
Inside the room. Admins can usually delete documents, folders and users. Deleted items may go to a recycle bin for a period before permanent removal, and the activity log typically keeps a record that the item existed and was deleted. Some platforms let admins set expiry dates on access or on documents.
At the end of the contract. The vendor removes the room from its live systems after a set period, often with a grace window in case the customer renews or needs a late export. Copies in backups remain until those backups expire on the vendor’s rotation schedule.
In backups. Backups exist to protect against data loss, and most vendors do not delete individual rooms from them. Instead, the room’s data disappears when each backup set ages out. The vendor’s security documentation or contract should state that period.
What does the law say about deletion?
Several rules can apply, depending on where the parties are and what the room contains.
Under the EU and UK GDPR, a data room vendor processing personal data on your behalf is a processor. Article 28 requires the processing contract to oblige the processor to delete or return all personal data at the end of the services, at the controller’s choice, unless law requires further storage. The storage limitation principle in Article 5 also means personal data should not be kept longer than needed, which applies to your own archive as well as to the vendor’s copy.
In the United States, there is no single federal deletion rule for data rooms, but sector rules, state privacy laws and contractual confidentiality obligations often require secure disposal. Confidentiality agreements signed with bidders usually require them to return or destroy information if the deal does not proceed; the seller should hold itself and its vendors to similar standards.
For physical and logical sanitization of storage, vendors commonly refer to NIST Special Publication 800-88, the US government’s guidelines for media sanitization. A vendor that cites it in its security documentation is signaling a defined process.
What do the platforms publish about security and privacy?
Our facts file records attestations and features rather than deletion terms, which vary by contract. The figures below show the building blocks: an exportable activity log for the archive, and the certifications that indicate an audited security program.
Archive and assurance building blocks across the 18 platforms
Every platform lists an activity log for the closing record
An audited information security management system
Datasite, iDeals, Box, Drooms, DocSend
ISO 27001 matters here because its controls include secure disposal and backup management, so a certified vendor has an audited process for both. A SOC 2 report, which all 18 platforms list in our facts file, may describe similar controls; ask for the relevant sections. The feature comparison shows the full feature set for each platform.
Which contract terms should cover deletion?
Before signing, ask the vendor to confirm these points in the order form, the master agreement or the data processing addendum.
| Term | What to ask | A reasonable answer |
|---|---|---|
| Export window | How long after the end date can we still export? | A defined period, such as 30 days |
| Live deletion | When is room content removed from live systems after the end date? | A defined number of days after the export window |
| Backup expiry | When do backups containing the room expire? | A stated rotation period |
| Confirmation | Will you confirm deletion in writing? | Written confirmation or certificate on request |
| Early deletion | Can we request deletion before the end date? | Yes, on written request from an authorized admin |
| Sub-processors | Do hosting and AI providers delete on the same schedule? | Yes, under their own contracts with the vendor |
| Legal holds | What happens if we need to preserve the room for litigation? | A paid read-only extension or preserved archive |
How do you close a room properly?
Closing a data room: archive, then delete
- Agree what the archive contains
Confirm with counsel which items are needed: documents, index, Q&A log, activity log, user list and permission history.
- Remove losing bidders first
Disable access for parties no longer in the process as soon as they leave, so the archive shows a clear end date for each.
- Export the archive
Run the exports while the room is active and check that each opens, is complete and matches the room.
- Store the archive securely
Place it in a restricted location under your retention policy, with a named owner and a review date.
- End all remaining access
Remove the buyer and any advisers, then internal users. Leave one admin until deletion is confirmed.
- Request deletion in writing
Ask the vendor to delete the room and confirm the date of live deletion and backup expiry.
- File the confirmation
Keep the vendor's written confirmation with the archive as evidence that deletion was requested and performed.
How long should your own archive be kept?
The archive you keep is subject to your own retention policy. Common anchors are the limitation period for claims under the transaction documents, the survival period of warranties and indemnities, and any regulatory record-keeping rules that apply to your sector. Counsel usually sets the period; the archive owner’s job is to make sure it is followed, including deleting the archive at the end.
Store personal data in the archive only as long as there is a reason to. If the archive holds HR files or customer data that were redacted for bidders but kept in full internally, consider whether the full versions need to be in the deal archive at all. The restructuring shortlist weights security controls for processes where records may be scrutinized years later, and our guide to due diligence software’s role in closing covers the final weeks before signing.
Deletion questions for any data room vendor
- How long after the end date can we export?
- When is content deleted from live systems?
- When do backups containing our room expire?
- Will you confirm deletion in writing?
- Do sub-processors, including AI providers, delete on the same schedule?
Frequently asked questions
Does a data room vendor delete files after the deal?
Reputable vendors delete room content after the contract ends, usually after an export window, with backups expiring later on a rotation schedule. Confirm the timeline in writing before signing.
Can we get a certificate of deletion?
Many vendors provide written confirmation or a certificate on request. Ask during contracting rather than at the end, so the obligation is in the agreement.
What happens to backups when a room is deleted?
Backups usually are not edited to remove one room. The data disappears when each backup set expires. Ask the vendor for the backup retention period.
Should the activity log be kept after closing?
Yes. It shows who saw which document and when, which can matter in warranty claims and disputes. Export it with the documents and the Q&A log.